Ezy Installation

Tools required: screws (10g), Screwdriver, Drill & Rubber Mallet. (not included with packs)

  • 1. Position Base Rod
  • 2. Screw base rods into place with suitable screws for surface
  • 3. Use single rod or connect rods for desired length
  • 4. Tap locking sleeve onto base rod(s)
  • 5. Trim excess fabric
  • 6. If repositioning, please gently lever locking sleeve on one end with screwdriver and slide off.

Rods and sleeves can be quickly and accurately cut to size with a hacksaw or cutters. To remove sleeve for re-positioning or re-tensioning fabric etc,
gently lever off locking sleeve at one end with screwdriver and simply slide off.